
Units placed fast when a building loses its restrooms or a response needs a staging area.
Mon-Sat 4am-4pm · delivered across Orange County
The calls in this category are the ones where nobody planned anything. A water main goes under a commercial block and forty tenants lose their restrooms. A sewer lateral backs up at a school. A fire response sets up a staging area in a parking lot and needs facilities for crews before anything else arrives.
What we can do is move quickly with whatever is on the yard and get a workable bank on the ground the same day where the timing allows it, then adjust the count once somebody has a clearer picture of how long the situation lasts. Early on, more units placed roughly right beats a perfect count that takes another day.
Orange County's version of this is usually water infrastructure, wind-driven fire in the canyons east of Anaheim, and the occasional winter storm that takes out a facility. In all three the first question is access - where can a truck actually reach, given whatever is closed.
Call and tell us the situation. We will tell you honestly what can be on the ground today and what has to be tomorrow, rather than promising and missing.
Main breaks, lateral failures and restroom renovations at commercial and institutional buildings. Units at the entrance the tenants already use.
Restrooms and hand-wash stations for response crews, placed clear of apparatus movement and equipment staging.
Start with enough, correct in a day or two once the duration is clearer. Billing follows the units actually on site.
Where the yard has stock and access is clear, the same day. Call early in the day rather than late - the honest answer depends on what is already loaded and where the trucks are.
Yes, that is the most common emergency call - a main break or a lateral failure at a commercial building. Units go at the entrance tenants already use, with a hand-wash station beside them.
Yes, for staging areas and crew support, sited clear of apparatus movement. Access is the limiting factor when roads are closed, so tell us the approach you have.
Start with the count that covers the situation and adjust in a day or two. Billing follows the units actually on site, so there is no penalty for correcting the number down.
Yes, and they should be part of the first drop rather than an afterthought - particularly on a sewer or water event where washing is the immediate concern.
Usually, though there are fewer of them in the fleet. Ask on the first call so one is loaded with the initial drop rather than following a day later.
Call and we will size the order and give you a flat rate.
(714) 909-1452